So you’ve decided on an inground pool and you’re ready to go swimming now. How long is this going to take?
Installing an inground swimming pool is a bigger job than many people recognize, including permits, digging, construction, wiring, and all of the finishing touches. You’ll probably be waiting a while before you can do a cannonball into your pool, but it all depends on a variety of factors, from what time of year you’re building to what kind of pool you want.
In this article, we’ll look at how to estimate the time it will take to install an inground pool.
How Long Does an Inground Pool Take to Install?
The average is between 8-12 weeks. That includes the installation itself (2 days to 8 weeks) plus the planning stage and the finishing touches. However, there are a lot of variances, especially depending on the type of pool.
Fiberglass Pools
A fiberglass pool is constructed off-site, so they essentially come pre-made. This means they can be installed quickly so you can swim earlier.
Technically, it only takes a few days to fully install a fiberglass pool. In some cases, it can be done in a single day! However, in reality, you’ll need to do the planning, get permits, and dig a hole first, and delivery delays are common. If everything goes according to plan, you can enjoy the pool within 2 to 4 weeks.
Vinyl Liner Pools
These usually come in kits that you assemble yourself, so there is some more work required onsite than there is with fiberglass pools. You’ll need to do all of the same planning and digging, plus assemble the frame and the liner. You can install a vinyl liner pool in 6 to 8 weeks.
Concrete Pools
These take by far the longest to construct, although concrete offers the most flexibility in terms of design and construction. There is nothing prefabricated about a concrete pool. Everything must be done on-site, and it can take up to a month to cure the concrete before it will be ready to fill with water. A concrete pool takes an average of 3 to 6 months to install.
Speeding Up the Pool Installation Process
Some things you can’t control, but some things you can. Here are some tips for getting your pool installed faster.
- Choose fiberglass rather than vinyl liner or concrete, for the fastest installation
- Prepare the area in advance
- Get permits and paperwork right away
- Build in the fall or winter, rather than spring or summer when demand is highest
Contact the Pool Installation Experts
If you want your pool installed the right way, as soon as possible, reach out to the pool installation experts at Scott Payne Custom Pools. We offer pool installation in Haverford, PA, and we are the best pool builder in Merion Station, PA. Our skilled and experienced pool installers can help you get into your perfect pool sooner than you think!